Check our traffic and travel update for current and forthcoming road closures and roadworks in Cambridgeshire.
Ely/Littleport
Bank Branch closed between Queen Adelaide and Littleport due to a collision. Road will remain closed until police have dealt with the incident. Avoid area and expect delays.
A428 Eltisley
Delays eastbound between Croxton and Caxton Gibbet for around three miles. Allow extra time for your journey.
A142 Ireton Way - Chatteris
Delays southbound for around three miles on the approach to Witcham Toll.
A10 Cambridge Road - Stretham
Delays of around four miles between Ely and Chittering. Allow extra time for your journey.
Kimbolton Road at Stow Longa
Closed both ways until January 12 due to work by Anglian Water.
B1040 Mill Green – Warboys
Closed until January 11 due to works by Cadent Gas.
Webbs Road - West Wicken
Closed both ways to all traffic until January 11 due to works by Cambs Water.
Hollow Lane - Ramsey
Closed both ways to all traffic until January 11 due to work by UK Power Networks.
Fen Drayton Road and Swavesey Road – Swavesey
Closed until January 12 between the hours of 9.30am and 3.30pm daily due to works by Openreach.
The Row – Sutton
Closed until January 12 due to works by Cadent Gas.
B1428, Great North Road - Eaton Socon
Two-way signals in place for emergency works by UK Power Networks until January 12.
Glatton Road - Sawtry
The road will be closed both ways to all motor vehicles between January 12-14 due to works by ES Pipelines Ltd.
Great Northern
Major engineering works during January 13-14. There are no trains services to/from London and extremely limited rail replacement bus services.
High Street - Over
The road will be closed both ways to all motor vehicles Sundays only between January 14-28 between the hours of 9.30am and 3.30pm due to works by Openreach.
B1040 High Street - Warboys
The road will be closed both ways to all motor vehicles on January 15 between the hours of 9.30am and 2.30pm for carriageway works.
Rock Road - Cambridge
Closed to all traffic until January 26 due to works by the Electricity Network Company.
B1104 Station Road - Isleham
Closed both ways to all traffic until January 26 due to works by Anglian Water. High Street - Over (between Overcote Road and Horse Ware).
Maris Lane, Grantchester Road and Church Lane, Cambridge/ Trumpington
The road will be closed to all traffic till January 26 for footway works.
Coldhams Lane - Cambridge
Road closure between Nuttings Road and Kings Meadow until February 5 due to works by UK Power Networks.
B1049 Twenty Pence Road – Wilburton
Closed until February 16 due to works by Anglian Water.
B1098 Sixteen Foot Bank – Stonea
Closed until March 8 due to works by Anglian Water.
Stonald Road - Whittlesey
Closed both ways to all traffic until March 12 due to work by Cadent Gas Ltd.
Forty Foot Bank, Chatteris
The road will be closed both ways to all motor vehicles between January 15 to March 15 due to works by Anglian Water.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here